ECSS document production status as of January 2020

Document ID Title Planned publication in 2020 Actual step
ECSS STANDARDS
ECSS-E-ST-10-04C Rev.1 (CR impl.) Space environment yes DRR Feedback to DRR owners
ECSS-E-ST-20-01C Multipaction design and test yes DRR Dispositioning
ECSS-E-ST-20-07C Rev.2 Electromechanical compatibility no Kick-off to be held
ECSS-E-ST-20-08C Rev.2 + ECSS-E-HB-20-08A Photovoltaic components and assemblies no Drafting
ECSS-E-ST-20-30C Design, requirements  and control of Harness no Kick-off to be held
ECSS-E-ST-20-40C ASIC and FPGA engineering no Drafting
ECSS-E-ST-32-01C Rev.2 Fracture control yes Public Review
ECSS-E-ST-35-06 Rev.2 Cleanliness requirements for spacecraft propulsion hardware yes TA Vote for publication
ECSS-E-ST-40C Rev.1 Software no Drafting
ECSS-E-ST-40-07C Simulation modelling platform (SMP) yes ES preparation for TA Vote for publication (plus CEN)
ECSS-E-ST-50C Rev.1 Communications yes ES preparation for parallel assessment
ECSS-E-AS-50-21C Adoption Notice of CCSDS 131.0-B-3, TM Synchronization and Channel Coding, Issue 3, September 2017 yes Parallel Assessment
ECSS-E-AS- 50-22C Adoption Notice of CCSDS 132.0-B-2, TM Space Data Link Protocol, Issue2, September 2015 yes Parallel Assessment
ECSS-E-AS- 50-23C Adoption Notice of CCSDS 231.0-B-3, TC Synchronization and Channel Coding, Issue 3, September 2017 yes Parallel Assessment
ECSS-E-AS- 50-24C Adoption Notice of CCSDS 232.0-B-3, TC Space Data Link Protocol, Issue 3, September 2015 yes Parallel Assessment
ECSS-E-AS- 50-25C Adoption Notice of CCSDS 232.1-B-2, Communications Operation Procedure-1, Issue 2, September 2010 yes Parallel Assessment
ECSS-E-AS- 50-26C Adoption Notice of CCSDS 732.0-B-3, AOS Space Data Link Protocol, Issue 3, September 2015 yes Parallel Assessment
ECSS-E-ST-50-16C Time triggered Ethernet yes Drafting
ECSS-M-ST-70C Integrated logistic support no Drafting
ECSS-Q-ST-30-11C Rev2 Derating yes ES preparation for parallel assessment
ECSS-Q-ST-60-13C Rev.1 Commercial electrical, electronic and electromechanical (EEE) components yes Drafting
ECSS-Q-ST-70-01C Rev.1 Cleanliness and contamination control no Kick-off to be held
ECSS-Q-ST-70-05C Rev.2 no NWIP for TA Vote and call for members
ECSS-Q-ST-70-15C Non-destructive inspection yes DRR implementation by WG
ECSS-Q-ST-70-16C Adhesive bonding for spacecraft and launcher applications yes DRR implementation by WG
ÈCSS-Q-ST-70-40C Hard brazing of metallic materials for flight hardware no Drafting
ECSS-Q-ST-70-61C (merge of 70-07C +CRs, 70-08C +CRs and 70-38C Rev.1) Space product assurance – High reliability soldering for surface mount and through-hole connections yes DRR implementation by WG
ECSS-Q-ST-70-80C (was Q-ST-70-19C Metallic powder bed-fusion Technology for space application no Drafting
ECSS HANDBOOKS
ECSS-E-HB-10-03A Testing handbook no Drafting
ECSS-E-HB-20-01A Multipaction design and test guidelines / handbbok yes DRR implementation by WG
ECSS-E-HB-20-03A Magnetic cleanliness handbook no Drafting
ECSS-E-HB-20-30A Guidelines for design, requirments and control of Harness no Kick-off to be held
ECSS-E-HB-32-23A Rev.1 Threaded fasteners handbook yes Drafting
ECSS-E-HB-32-26A Rev.1 Spacecraft mechanical loads analysis handbook no Drafting
ECSS-E-HB-40-01A Agile software development handbook yes DRR implementation by WG