Search results
Result 1 - 10 (of 15 results) for ""
- ECSS-E-ST-40-07C-DIR1: Public Review (24 September 2018 - 31 January 2019) Category: Home, Standard
- ECSS-Q-ST-70-16C-DIR2 (28May2018) “Space product assurance – Adhesive bonding for spacecraft and launcher applications” (29 May -23 July 2018) --> Extended until 31 August 2018 Category: Home, Standard
- ECSS-E-ST-32-10C-Rev2-DIR1 (5March2018): “Space engineering – Structural factors of safety for spaceflight hardware” (Public Review: 26 March – 22 May 2018) Category: Home, Standard
- ECSS-E-ST-20-21C-DIR1: Electrical design and interface requirements for actuators (Public Review: 3 July - 28 September 2018) Category: Home, Standard
- ECSS-E-ST-20-06C-Rev.1-DIR1 (22 March 2018) “Space engineering – Spacecraft charging” (18 April - 15 June 2018) --> Extended until 31 August 2018 Category: Home, Standard
- ECSS-E-ST-50-11C-DIR1 (7March2018): “Space engineering – SpaceFibre – Very high-speed serial link (Public Review: 26 March – 22 May 2018) Category: Home, Standard
- ECSS-Q-ST-70-15C-DIR1 (16January2018): “Space product assurance – Non-destructive inspection” (16 January - 16 March 2018) Category: Home, Standard
- ECSS-U-ST-20C-DIR1 - Start of Public Review (Due: 16 March 2018) Category: Home, Standard
- ECSS-Q-ST-60-14C Rev.1 DIR1: Public Review (21 September - 19 November 2018) Category: Home, Standard
- ECSS-E-ST-40-07C-DIR1: Public Review (24 September 2018 – 31 January 2019) Category: Home, Standard