Document production status

ECSS document production status as of 15 January 2025

ECSS Number Actual Title Actual status Replacing
ECSS-E-HB-20-03A Magnetic cleanliness handbook Drafting
(Draft expected end 2025/begin 2026)
none
ECSS-E-HB-20-08A Guidelines for qualification of solar panels, PVA, substrates and components Drafting
(Draft expected end 2024)
none
ECSS-E-HB-20-41A Guidelines for the Automatic Code Generation for High Level Synthesis (HDL) in Space Applications Drafting put on hold none
ECSS-E-HB-32-24A Rev.1 Buckling of structures Drafting
(Draft expected begin 2026)
ECSS-E-HB-32-24A
ECSS-E-HB-32-26A Rev.1 Spacecraft mechanical loads analysis handbook Drafting
(Draft expected 2nd half 2025)
ECSS-E-HB-32-26A
ECSS-E-HB-32-27A Microvibration handbook Drafting
(Draft expected 2nd half 2025)
ECSS-E-HB-40A Rev.1 Software engineering handbook Drafting put on hold ECSS-E-HB-40A
ECSS-E-ST-32-02C Rev.2 Structural design and verification of pressurized hardware Public Review
(12 Dec. 2024 – 28 Feb. 2025)
ECSS-E-ST-32-02C Rev.1
ECSS-E-ST-40-07C Rev.1 Simulation Modelling Platform DRR implementation started 7 Jan. 2025 ECSS-E-ST-40-07C
ECSS-E-ST-40-08C SMP – Level 2 DRR implementation started 7 Jan. 2025
ECSS-E-ST-40C Rev.1 Software 2nd DRR Feedback
(15-31 Jan. 2025) in reply to comments received during 1st one.
ECSS-E-ST-40C
ECSS-E-ST-50-15C Rev.1 CANbus extension protocol Drafting put on hold
ECSS-E-ST-70-11C Rev.1 Space segment operability DRR implementation ECSS-E-ST-70-11C
ECSS-E-ST-70-41C Rev.1 Telemetry and telecommand packet utilization Public Review
(12 Dec. 2024 – 28 Feb. 2025)
ECSS-E-70-41A
ECSS-E-ST-80C Security in space systems lifecycles Published 1 July 2024
ECSS-Q-ST-20-30C Manufacturing and control of electrical harness Public Review (13 Sept. – 8 Nov. 2024)
ECSS-Q-HB-30-02A Reliability handbook Drafting
ECSS-Q-ST-60C Rev.4 Electrical, electronic and electromechanical (EEE) components Public Review
(6 Nov. 2024 – 17 Jan. 2025)
ECSS-Q-ST-60C Rev.3
ECSS-Q-ST-60-13C Rev.2 Commercial electrical, electronic and electromechanical (EEE) components Public Review
(6 Nov. 2024 – 17 Jan. 2025)
ECSS-Q-ST-60-13C Rev.1
ECSS-Q-ST-60-15C Rev.1 Radiation hardness assurance – EEE components DRR implementation
(Public Review, 11 Sep.-5Nov. 2024, resulted in 43 DRRs)
ECSS-Q-ST-60-15C
ECSS-Q-ST-70-01C Rev.1 Contamination and cleanliness control Public Review
(19 Nov. 2024 – 31 Jan .2025)
ECSS-Q-ST-70-01C
ECSS-Q-ST-70-12C Rev.1 Detection of organic contamination of surfaces by infrared spectroscopy DRR implementation started 8 Jan. 2025 ECSS-Q-ST-70-12C
ECSS-Q-ST-70-36C Rev.1 Material selection for controlling stress-corrosion cracking Drafting ECSS-Q-ST-70-36C
ECSS-Q-ST-70-37C Rev.1 Determination of the susceptibility of metals to stress-corrosion cracking Drafting ECSS-Q-ST-70-37C
ECSS-Q-ST-70-60C Rev.1 High reliability assembly for surface mount and through hole connections DRR implementation started 8 Jan . 2025 ECSS-Q-ST-70-60C
ECSS-Q-ST-80C Rev.2 Software product assurance Dispositioned  DRRs were approved. Waiting for 2nd DRR Feedback of ECSS-E-ST-40C Rev.1 DIR1 (due 31 Jan. 2025) ECSS-Q-ST-80C Rev.1