ECSS Number | Actual Title | Actual status | Replacing |
ECSS-E-HB-20-03A | Magnetic cleanliness handbook | Drafting (Draft expected end 2025/begin 2026) |
none |
ECSS-E-HB-20-08A | Guidelines for qualification of solar panels, PVA, substrates and components | Drafting (Draft expected end 2024) |
none |
ECSS-E-HB-20-41A | Guidelines for the Automatic Code Generation for High Level Synthesis (HDL) in Space Applications | Drafting put on hold | none |
ECSS-E-HB-32-24A Rev.1 | Buckling of structures | Drafting (Draft expected begin 2026) |
ECSS-E-HB-32-24A |
ECSS-E-HB-32-26A Rev.1 | Spacecraft mechanical loads analysis handbook | Drafting (Draft expected 2nd half 2025) |
ECSS-E-HB-32-26A |
ECSS-E-HB-32-27A | Microvibration handbook | Drafting (Draft expected 2nd half 2025) |
|
ECSS-E-HB-40A Rev.1 | Software engineering handbook | Drafting put on hold | ECSS-E-HB-40A |
ECSS-E-ST-32-02C Rev.2 | Structural design and verification of pressurized hardware | Public Review (12 Dec. 2024 – 28 Feb. 2025) |
ECSS-E-ST-32-02C Rev.1 |
ECSS-E-ST-40-07C Rev.1 | Simulation Modelling Platform | DRR implementation started 7 Jan. 2025 | ECSS-E-ST-40-07C |
ECSS-E-ST-40-08C | SMP – Level 2 | DRR implementation started 7 Jan. 2025 | |
ECSS-E-ST-40C Rev.1 | Software | 2nd DRR Feedback (15-31 Jan. 2025) in reply to comments received during 1st one. |
ECSS-E-ST-40C |
ECSS-E-ST-50-15C Rev.1 | CANbus extension protocol | Drafting put on hold | |
ECSS-E-ST-70-11C Rev.1 | Space segment operability | DRR implementation | ECSS-E-ST-70-11C |
ECSS-E-ST-70-41C Rev.1 | Telemetry and telecommand packet utilization | Public Review (12 Dec. 2024 – 28 Feb. 2025) |
ECSS-E-70-41A |
ECSS-E-ST-80C | Security in space systems lifecycles | Published 1 July 2024 | |
ECSS-Q-ST-20-30C | Manufacturing and control of electrical harness | Public Review (13 Sept. – 8 Nov. 2024) | |
ECSS-Q-HB-30-02A | Reliability handbook | Drafting | |
ECSS-Q-ST-60C Rev.4 | Electrical, electronic and electromechanical (EEE) components | Public Review (6 Nov. 2024 – 17 Jan. 2025) |
ECSS-Q-ST-60C Rev.3 |
ECSS-Q-ST-60-13C Rev.2 | Commercial electrical, electronic and electromechanical (EEE) components | Public Review (6 Nov. 2024 – 17 Jan. 2025) |
ECSS-Q-ST-60-13C Rev.1 |
ECSS-Q-ST-60-15C Rev.1 | Radiation hardness assurance – EEE components | DRR implementation (Public Review, 11 Sep.-5Nov. 2024, resulted in 43 DRRs) |
ECSS-Q-ST-60-15C |
ECSS-Q-ST-70-01C Rev.1 | Contamination and cleanliness control | Public Review (19 Nov. 2024 – 31 Jan .2025) |
ECSS-Q-ST-70-01C |
ECSS-Q-ST-70-12C Rev.1 | Detection of organic contamination of surfaces by infrared spectroscopy | DRR implementation started 8 Jan. 2025 | ECSS-Q-ST-70-12C |
ECSS-Q-ST-70-36C Rev.1 | Material selection for controlling stress-corrosion cracking | Drafting | ECSS-Q-ST-70-36C |
ECSS-Q-ST-70-37C Rev.1 | Determination of the susceptibility of metals to stress-corrosion cracking | Drafting | ECSS-Q-ST-70-37C |
ECSS-Q-ST-70-60C Rev.1 | High reliability assembly for surface mount and through hole connections | DRR implementation started 8 Jan . 2025 | ECSS-Q-ST-70-60C |
ECSS-Q-ST-80C Rev.2 | Software product assurance | Dispositioned DRRs were approved. Waiting for 2nd DRR Feedback of ECSS-E-ST-40C Rev.1 DIR1 (due 31 Jan. 2025) | ECSS-Q-ST-80C Rev.1 |