This Standard cancels and replaces ECSS-Q-ST-10-09C ( 31 July 2008).
Scope
This Standard defines the requirements for the control of non-conformances.
This Standard applies to all deliverable products and supplies, at all levels, which fail to conform to project requirements.
This Standard is applicable throughout the whole project lifecycle as defined in ECSS-M-ST-10.
This standard may be tailored for the specific characteristics and constrains of a space project in conformance with ECSS-S-ST-00.
Attachments
Md5 checksum .doc file = A18B5FE31745CC2B1D8F914D01C83F42
Md5 checksum .pdf file = 4F0E60B07DF490F2C0A8ECDC01B0FB34
DRDs of this standard:
Nonconformance Report: ECSS-Q-ST-10-09C-Rev.1(1March2018)AnnexA
NCR Status List: ECSS-Q-ST-10-09C-Rev.1(1March2018)AnnexB
plus informative Annex: Nonconformance report template: ECSS-Q-ST-10-09C-Rev.1(1March2018)AnnexC