ECSS-E-ST-10-04C-Rev.1-DIR1: Public Review from 14 March – 10 May 2019

Our reference: QR/2019-56/RJ/ke

 

Please find attached for Public Review: ECSS-E-ST-10-04C-Rev.1-DIR1 (31 January 2019) ‘Space engineering – Space environment’.

Start of Public Review: 14 March 2019
End of Public Review: 10 May 2019 

Review comments (DRRs) shall be submitted using the online ECSS DRR form on the ECSS.NL website.

Filling-in instructions for the online DRRs:
1. A maximum number of 10 DRRs can be submitted at one time. In case you have more DRRs please submit them by batches of 10.
2. Do not use colour highlighting, strikethrough or other formatting options.
3. When copying text from Word or Excel file paste the text into the form without formatting.
PROPOSAL: copy text from Word or Excel first into a NOTEPAD to strip the text from all formatting and then copy and paste it into the field of the DRR form.
4. Use an Attachment for extensive DRRs or large amount of text. need to be logged-in to the ECSS Website before being able to create your DRRs.

Best regards

Klaus Ehrlich
ECSS Executive Secretariat

Attachments