Our reference: QES/2020-36/KE
Dear TA members,
Please find attached ECSS-E-ST-20-07C Rev.1 “Space engineering – Electromagnetic compatibility” for Public Review.
Use for your review the pdf-file where all deletions were hidden.
In case you want to see also the deleted text, please consult the Word file.
NOTE: Only the modified parts of the document are subject for Review. Comments to other parts will be treated as new Change Requests.
End of the Public Review is 14 May 2021
All Review comments (DRRs) shall be submitted using the online ECSS DRR form on the ECSS.NL website.
Filling-in instructions for the online DRRs:
1. A maximum number of 10 DRRs can be submitted at one time. In case you have more DRRs please submit them by batches of 10.
2. Do not use colour highlighting, strikethrough or other formatting options.
3. When copying text from Word or Excel file paste the text into the form without formatting.
PROPOSAL: copy text from Word or Excel first into a NOTEPAD to strip the text from all formatting and then copy and paste it into the field of the DRR form.
4. Use an Attachment for extensive DRRs or large amount of text. need to be logged-in to the ECSS Website before being able to create your DRRs.
At the end of the Public Review the TA representatives are asked to release all the DRRs for their organization received via their personal TA Team Website and reply to the Task for this Public Review that they completed the Public Review.
In case of problems with the ECSS.NL website please contact the ECSS Executive Secretariat directly
Best regards
Klaus Ehrlich
ECSS Executive Secretariat
2 attachments: